
Products
Commercial Fishing Gear
Trawls, doors, warps, netting, and deck gear engineered for North Atlantic fisheries — supplied, built, repaired, and supported from local shops.
Products
144 products — showing 25–48
TypeAll


- Sizes
- 4
- WLL 5:1
- 7–19 ton



BMM
- Sizes
- 2
- WLL 5:1
- 2–3 ton




- Sizes
- 1

- Sizes
- 3

- Sizes
- 8
Showing 25–48 of 144
We supply the gear. We do the work.
Built, repaired and rigged by the same shops that stock it.
Who we supply
All industriesStocked and serviced at
All locationsStart a quote. We route it to the right branch.
Send specs, photos, drawings, or inspection and testing requests. Your reply comes from the branch that will do the work.























