BMM
Master links (EVM08XL–EVM200)
Available on request
Master links in 5 sizes, 8–20 ton WLL.

Specifications
| Diameter range | 21–34 mm |
|---|---|
| Working load limit | 8–20 ton |
| Sizes tabulated | 5 |
Missing a spec? It's available on request — send us your requirement.
Sizes & part numbers
5 sizes available. Quote by part number, or send us the load and we'll size it.
Scroll the table sideways for all 7 columns.
Related services
Related industries
Start a quote. We route it to the right branch.
Send specs, photos, drawings, or inspection and testing requests. Your reply comes from the branch that will do the work.

